The Fastest, Easiest HVAC Install
Leaky Boots, Costly Consequences
There’s a weak link in traditional HVAC installs: the register boot. When it’s not sealed properly, it leaks air and lets in debris. Builders end up wasting time, failing inspections, and losing energy efficiency. It’s frustrating, inefficient—and avoidable.

The Smart Solution:
Speedi-Boot
Speedi-Boot was built to eliminate all the usual boot problems with one simple upgrade. It’s not just compliant—it’s clever.
Why Speedi-Boot is a game-changer:
-
Includes a debris and test cover: Keeps the system clean during construction.
-
Closed-cell foam gasket: Creates a tight seal to the building envelope.
-
Rigid construction: Prevents warping or deformation during trim install.
-
Pressure-test ready: Pass your tests the first time, every time.
Built for Speed, Made to Last
Installing Speedi-Boot takes around two minutes, thanks to its smart design: telescoping hanger arms, rigid mud ring, and adjustable positioning make setup fast and frustration-free. Whether it’s a wall, floor, or ceiling—Speedi-Boot fits right in.
Here’s a quick look at the available options:
Product Size | Styles | Product # |
---|---|---|
2.25x12 | SB, FB, NB, EB | SBH-212 |
4x8 | SB, FB, NB, EB | SBH-48 |
4x10 | SBS, FB, NB, EB, WS | SBH-410 |
4x12 | SBS, FB, NB, EB, WS | SBH-412 |
4x14 | SBS, FB, NB, EB | SBH-414 |
6x6 | SB, FB, NB, EB | SBH-66 |
6x8 | SB, FB, NB, EB | SBH-68 |
6x10 | SBS, FB, NB, EB, WS | SBH-610 |
6x12 | SBS, FB, NB, EB, WS | SBH-612 |
6x14 | SB, FB, NB, EB | SBH-614 |
8x8 | NB, SRA | SBH-88 |
8x14 | SB, FB, NB, EB | SBH-814 |
10x10 | NB | SBH-1010 |
12x12 | SRA | SBH-1212 |
14x14 | SRA | SBH-1414 |
14x24 | SRA | SBH-1424 |
8x10 | SB, NB, EB | SBH-810 |
Fully Code Compliant
Speedi-Boot is built to meet or exceed all major energy and construction standards:
-
2009 IECC
-
2009 IRC
-
2011 WSEC
-
ENERGY STAR® Homes V2.5 & V3
It seals boots, ducts, joints, seams, and penetrations right at rough-in—no extra tape, no field fixes, no last-minute inspection nightmares.
FAQ
How does Speedi-Boot help me pass energy code inspections?
By using Speedi-Boot, you address the most common points of failure in energy code inspections for ductwork and ventilation boots, making it easier to pass and maintain compliance with modern building standards.
The integrated dust and debris cover protects ductwork from contamination during construction, which is a requirement for some energy and indoor air quality codes.
Inspectors can visually confirm the presence of the foam gasket, dust cover, and secure mounting, making it straightforward to demonstrate compliance during inspections.
The airtight seal enables successful duct pressure testing, a common requirement for energy code inspection and certification.Can Speedi-Boot be used in both new construction and retrofits?
Yes, Speedi-Boot is designed for use in both new construction and retrofit/remodel projects – both residential and light commercial.
New Construction:
Speedi-Boot’s integrated dust and debris cover, foam gasket, and rigid steel frame make it ideal for installation during the building phase. It can be quickly mounted to wood or metal studs, joists, or trusses, and is suitable for walls, ceilings, and floors in residential and commercial buildings.
Retrofits and Remodeling:
The telescoping, reversible mounting arms and pre-attached nails or screws allow for easy installation in existing structures. These features make it straightforward to add or replace vents in finished spaces without extensive demolition or framing work.How much time can I save per install using Speedi-Boot?
Speedi-Boot can reduce installation time by approximately 90%, saving you from over 20 minutes per install to as little as 2 minutes or less.
Speedi-Boot’s integrated design—with telescoping mounting arms, pre-attached nails, and a built-in foam gasket—eliminates the need for site preparation and framing, allowing most installations to be completed in 2 minutes or less.
By switching to Speedi-Boot, you can expect to save at least 15–18 minutes per vent boot installation, which adds up to substantial labor and cost savings on larger projects.Is Speedi-Boot approved by ENERGY STAR® or other certifications?
Speedi-Boot helps projects comply with ENERGY STAR® Homes guidelines and LEED requirements but is not itself an ENERGY STAR®-certified product.
It supports compliance with major energy codes and green building programs by improving air sealing, energy efficiency, and indoor air quality.
Speedi-Boot is credited for LEED 5.1 Environmentally Preferred Products and meets IEQ 3.1 Construction IAQ Management Plan During Construction requirements, supporting green building certifications such as LEED. It also complies with ASHRAE 90.1 standards for air leakage and duct sealing, which are referenced by many energy codes and certification programs.Do the boots deform during installation or drywalling?
Speedi-Boot is specifically designed to prevent deformation during installation and drywalling. The product features a rigid steel frame and a mud ring, which provide a sturdy edge for drywall installers to cut against and help maintain the shape of the boot throughout the construction process. This rigidity ensures that the boot does not flex, bend, or become misshapen when drywall is installed or when the register trim is attached.
Additionally, the mud ring not only helps prevent boot deformation but also ensures a consistent and professional finish at the vent opening. The steel frame offers solid backing for grille or register installation, eliminating issues like loose or sagging trim.Can I use Speedi-Boot with flex duct and rigid ductwork?
Speedi-Boot is designed to accommodate both flexible duct and rigid ductwork by providing a universal collar and straightforward installation steps tailored to each material:
- For flex duct, the installation involves pulling back the outer liner and insulation, sliding the inner core of the flex duct over the Speedi-Boot collar, and securing it with approved foil tape for an airtight seal. The insulated outer jacket is then pulled over the collar and fastened with a zip tie, ensuring both insulation and a secure connection.
- For rigid ductwork (such as sheet metal), the connection is made using standard sheet metal screws and foil tape, following typical HVAC practices to ensure a solid, airtight joint.
The Speedi-Boot’s universal collar and robust mounting system (with telescoping arms and a gasketed flange) allow it to interface seamlessly with either duct type, supporting both the flexible and rigid materials commonly used in residential and commercial HVAC installations.
How do I calculate my savings from switching to Speedi-Boot?
Labor Savings
- Faster Installation: Speedi-Boot is designed for a simple, two-minute installation, significantly reducing labor time compared to traditional vent boot methods.
- Fixed Labor Cost: The ease and consistency of installation allow for more accurate project estimates and less variability in labor costs.
- Reduced Callbacks: The robust design and air-tight seals help minimize the need for post-installation adjustments or repairs, saving additional labor costs
Energy Savings
Air-Tight Seal: The integrated foam gasket creates a sealed connection, preventing air leaks that typically occur with conventional boots. This reduces conditioned air loss, improving HVAC system efficiency and lowering energy bills.
Improved Building Envelope: By minimizing duct leakage, Speedi-Boot helps maintain the integrity of the building envelope, further reducing energy consumption for heating and cooling
Material and Quality Savings
Dust and Debris Protection: The built-in dust cover protects the HVAC system during construction, reducing cleaning costs and improving indoor air quality.
Durability: The rigid galvanized steel frame and mud ring prevent deformation and accidental covering, reducing the risk of damage during drywall installation and the need for replacement boots.